The nîmes university hospital acts in favor of sustainable development

Interview with Marie-Laure Piqué, Engineering and Christophe Chaussende, Purchasing Director / Logistics – material resource center – Nîmes university hospital To optimize resources, the hospital made the decision to invest in renewable energy and thus participate in the energy transition without engaging investments. Urbasolar was the one to invest, design, install, and operate the 17,000 m2 […]

The nîmes university hospital acts in favor of sustainable development

Interview with Marie-Laure Piqué, Engineering and Christophe Chaussende, Purchasing Director / Logistics – material resource center – Nîmes university hospital To optimize resources, the hospital made the decision to invest in renewable energy and thus participate in the energy transition without engaging investments. Urbasolar was the one to invest, design, install, and operate the 17,000 m2 […]

Towards a 100% renewable energy hospital

Interview with Philippe Casier, Energy and Sustainable Development Engineer – Carcassonne Hospital Center. 25,000 m² of parking canopies equipped with photovoltaic panels for a capacity of 4 MWp, a project co-financed by Urbasolar and the SYADEN (Aude region energy and digital association). For this high environmental quality (HEQ) and very high energy performance hospital commissioned […]

Towards a 100% renewable energy hospital

Interview with Philippe Casier, Energy and Sustainable Development Engineer – Carcassonne Hospital Center. 25,000 m² of parking canopies equipped with photovoltaic panels for a capacity of 4 MWp, a project co-financed by Urbasolar and the SYADEN (Aude region energy and digital association). For this high environmental quality (HEQ) and very high energy performance hospital commissioned […]

Towards a 100% renewable energy hospital

Interview with Philippe Casier, Energy and Sustainable Development Engineer – Carcassonne Hospital Center. 25,000 m² of parking canopies equipped with photovoltaic panels for a capacity of 4 MWp, a project co-financed by Urbasolar and the SYADEN (Aude region energy and digital association). For this high environmental quality (HEQ) and very high energy performance hospital commissioned […]

Coexsistance with airfield activity on an abandoned airport property

Interview with Pascal Terrasse, President of the departmental equipment association of Ardèche (SDEA). « At the project’s origin, the goal was to make better use of the land bordering the airfield within the constraints of an aeronautical environment. A serious study of the risks of glare to aerial navigation was carried out before the project […]

Coexsistance with airfield activity on an abandoned airport property

Interview with Pascal Terrasse, President of the departmental equipment association of Ardèche (SDEA). « At the project’s origin, the goal was to make better use of the land bordering the airfield within the constraints of an aeronautical environment. A serious study of the risks of glare to aerial navigation was carried out before the project […]

Coexsistance with airfield activity on an abandoned airport property

Interview with Pascal Terrasse, President of the departmental equipment association of Ardèche (SDEA). « At the project’s origin, the goal was to make better use of the land bordering the airfield within the constraints of an aeronautical environment. A serious study of the risks of glare to aerial navigation was carried out before the project […]

Restoration of a polluted site

Interview with Alain Legal, mayor of Faux since 2008, community of 610 inhabitants, local council community for the southern Périgord region, in Dordogne. After having visited a solar power plant in 2012 in the Gers region, the elected officials of Faux decided to install a photovoltaic power plant on a site in escheat, which had […]

Restoration of a polluted site

Interview with Alain Legal, mayor of Faux since 2008, community of 610 inhabitants, local council community for the southern Périgord region, in Dordogne. After having visited a solar power plant in 2012 in the Gers region, the elected officials of Faux decided to install a photovoltaic power plant on a site in escheat, which had […]

Restoration of a polluted site

Interview with Alain Legal, mayor of Faux since 2008, community of 610 inhabitants, local council community for the southern Périgord region, in Dordogne. After having visited a solar power plant in 2012 in the Gers region, the elected officials of Faux decided to install a photovoltaic power plant on a site in escheat, which had […]

Énergie solaire : l’intérêt du groupe Urbasolar

Le Premier ministre, Paul Kaba THIEBA, a reçu en audience, le président du groupe Urbasolar, Arnaud MINE, le mardi 16 octobre 2018. La question de l’énergie solaire était au cœur des échanges. Le groupe Urbasolar veut investir dans l’énergie solaire au Burkina Faso. Le président de ce groupe, Arnaud MINE, a confirmé cet intérêt lors […]